Trench shoring in Edmonton
Dig deep enough that your crew has to get in? We get the trench ready for your shoring and help put it in.

- 15 hydrovac trucks
- 2 dump trucks and a skid steer
- 24/7 dispatch
- Since 2015
What is trench shoring?
Trench shoring holds back the walls of a dig so they can't fall in on the people working in it. It's what lets a crew go down to repair a line or put a new one in.
When do you need trench shoring?
- When someone has to work down in the hole.
The shoring has to leave them room to do the job.
- When the line you need is in crowded ground.
The dig generally starts by exposing it, then the shoring goes in around it. See daylighting.
- When a repair or install needs safe access.
Workers going down to fix a utility or put a new one in.
- When a trench's walls need bracing.
If the trench itself is the job, see slot trenching.
Your cage or trench box
The shoring is yours or your supplier's, a cage or a box picked for what the job needs.
We get the trench ready for it on civil and municipal jobs, industrial and oilfield sites, and residential work.
How hydrovac shoring goes in
The hydrovac generally starts by exposing the buried line, to confirm where it is.
The shoring is chosen to suit the work, with room for the crew if they're going in.
Your crew sets the cage or box in place at ground level, over the spot.
The hydrovac pulls material out from inside it, and it sinks into place, holding the walls as it goes down.
Only what the shoring needs
Only enough material comes out to let the shoring drop into place. That keeps the impact on the ground, and on the lines around it, to a minimum, and gives your crew a safe way in. It also leaves less to backfill once the work's done.
Alberta's rules on trench protection
In Alberta, Part 32 of the Occupational Health and Safety Code sets the rules for excavations and trenches, including how the walls are supported or cut back. It sorts soil into three types, and the type decides how the walls are protected. Check the Code against your own dig before the crew goes in.
What does trench shoring cost?
Tell us how deep and how wide the dig is, what's down there, and where the site is, and we'll quote it. What hydrovac costs covers what goes into a quote.
Questions people ask
Do you supply the shoring?
No. You or your supplier bring the cage or box. We prep the trench and help with the install.
Does the line get exposed first?
Generally, yes. The dig usually starts there.
Does frost stop the dig?
Generally not. The hydrovac cuts frozen ground with heated water. See frozen ground excavation.
Need it shored?